As on

398.00

NSE

397.75

BSE
  • As on
  • 398.00NSE
  • 397.75BSE

Limited Tenders

Profile
Last updated: 20/05/2026 06:53 PM

Archive Tenders (Limited Tenders)

Sr. No.Tender NoTitleLocation/ OfficeWeather FlaggedPre-Bid DateBid Closing Date & TimeBid Opening Date & TimeDetails
271CDC6683L25Construction of 1 nu...Construction of 1 number of security infrastructure (brick security morcha, security barrack & kitchen & toilet) for Scrapper Trap shed at Bordumsa along with construction of 3 numbers of foundations and sheds for placement of three numbers of Scrapper Trap at Kumchai EPS (2 nos.) and Bordumsa (1 no.) across Kumchai Kusijan Project Pipeline in Arunachal Pradesh. All materials are to be supplied by contractor except cementDuliajanNo-27/06/2024 11:00 AM27/06/2024 02:00 PMDetails
272CDC6684L25Construction of secu...Construction of security infrastructure (brick security morcha, security barrack & kitchen & toilet), foundation and shed for placement of one number Scrapper Trap at Khatangpani across Kumchai Kusijan Project Pipeline in AssamDuliajanNo-27/06/2024 11:00 AM27/06/2024 02:00 PMDetails
273SSI5681L24Rate Contract Tender...Rate Contract Tender for Stationery Printed Forms / Items DuliajanYes-26/06/2024 11:00 AM26/06/2024 02:00 PMDetails
274KIS6575L25Spares for Crude Oil...Spares for Crude Oil Dispatch Pump Set.KolkataNo-25/06/2024 02:00 PM25/06/2024 02:00 PMDetails
275KIS6155L25Spares for Single Ac...Spares for Single Acting Triplex Piston Slush PumpKolkataNo-25/06/2024 02:00 PM25/06/2024 02:00 PMDetails
276GOD6445L25 NEEDLE VALVE , Bomb ...NEEDLE VALVE , Bomb Container with inlet connection with proper adapter GuwahatiYes-20/06/2024 01:00 PM20/06/2024 01:00 PMDetails
277CDC6457L25Construction of 4 no...Construction of 4 nos. of R.C.C watch tower at Baghjan EPS including supply of all materials except cementDuliajanNo-20/06/2024 11:00 AM20/06/2024 02:00 PMDetails
278CDC6484L25Repairing / Construc...Repairing / Construction of ring road inside langkashi OCS by by 100 MM thick GSB,75 MM thick WBM (Two layers), applying prime coat, tack coat and 40 mm SDBC ( Length : 492 meters )including supply of all materials by contractorDuliajanNo-20/06/2024 11:00 AM20/06/2024 02:00 PMDetails
279SSI6192L25SWITCH FLAMEPROOFSWITCH FLAMEPROOFDuliajanYes-19/06/2024 11:00 AM19/06/2024 02:00 PMDetails
280CDC6589L25Construction of Fabr...Construction of Fabrication Yard Shed inside STF Madhuban, including supply of all materials except cementDuliajanNo-18/06/2024 11:00 AM18/06/2024 02:00 PMDetails